Approved Ordinance 1391, amending Chapter 150, Vehicles and Traffic, Article III, Parking Regulations, Section 26.
PassedApproved a payment request from RKR Hess for Invoice #109409 in the amount of $32,762.06.
PassedApproved a payment request from Pioneer Construction, Co., Inc. for work completed through June 30, 2022, in the amount of $304,090.40.
PassedDelivery trucks on Dansbury Terrace blocking parking spaces and no enforcement.
Request for better clarification and review of the current verbiage included in Chapter 122, Article VI, Grass and Weeds.
The approved ordinance aims to reduce sedimentation in the Borough's stormwater system, which will help improve water quality and reduce environmental impacts.
A federal requirement for municipalities to reduce sedimentation in stormwater systems.
A type of retaining wall used to prevent erosion and sedimentation.
This structured legislative summary was generated using AI analysis of the official municipal record. For verified legal documentation, please download and consult the original PDF.
Approved a change of scope for the Middle Dam project in an amount not to exceed $33,000.00.
PassedApproved a pilot study for a pH adjustment system at the WWTP discharge in an amount not to exceed $35,000.00.
PassedApproved a payment request for the Brown Street Water Main Project in the amount of $89,910.00.
PassedAuthorized the Borough Manager to contact the Public Utility Commission (PUC) regarding Verizon and UGI installing lines directly over top of the Borough's water main on Brown Street and South Courtland Street.
PassedDirected the Borough Engineer to quantify the additional costs incurred by the Borough as a result of improperly marked utility locations by Verizon and UGI.
Passed