Approved the proposal for Borough-wide water meter installation from Core & Main at unit prices based upon Costars pricing with total cost not to exceed $650,000, contingent upon approval of the installation plan and for it to be forwarded to the Operations Committee for approval.
PassedAuthorized advertisement of bids for the Levee Culvert Project with a bid opening date of June 28, 2023.
PassedExtended final report to the second Council meeting on June 20, 2023 to include provision cost, estimated manpower, and equipment.
PassedPerry St drainage and water flow issues
MOU regarding Terra Greens and leasing the property as a golf course
The water meter replacement project will improve the Borough's infrastructure and provide accurate readings. The Levee Culvert Project will enhance public safety and reduce maintenance costs.
The Borough is still trying to locate a lab that can do the type of testing needed for the permit.
The policy was updated and forwarded to the Solicitor and Operations Committee for review.
This structured legislative summary was generated using AI analysis of the official municipal record. For verified legal documentation, please download and consult the original PDF.