Approved establishing a segregated escrow account for monies donated for additional upgrades to Veterans Park with a fundraising goal of $10,000.00.
PassedAuthorized advertising for bids of the Middle Dam and Intake Waterline Rehabilitation project on or after November 23, 2020.
PassedApproved payment request #2 to Hendricks and Winot Group, Inc. dba Northeast Site Contractors for the South Green Street Paving and ADA Project.
Renaming the creek that runs from the reservoir to Route 447
Concerns about the Veterans Park Re-dedication ceremony
The approved actions are expected to have a positive impact on the community by improving public health and safety, as well as enhancing the overall quality of life.
A project to repair and upgrade the Middle Dam and intake waterline system.
A policy outlining procedures for monitoring and responding to COVID-19 symptoms and temperatures in Borough facilities.
This structured legislative summary was generated using AI analysis of the official municipal record. For verified legal documentation, please download and consult the original PDF.
Approved payment request #1 to A.C. Schultes, Inc. for the Reconditioning of Well Nos. 3 and 4.
PassedApproved change order #1 for the Reconditioning of Well Nos. 3 and 4, representing a contract increase in the amount of $7,081.00.
PassedAuthorized RKR Hess to conduct a rate study to ensure that water rates cover debt services for upcoming water projects.
PassedApproved advertising and posting the proposed 2021 East Stroudsburg Borough Budget as approved at the November 10, 2020 Budget Workshop for approval at the December 15, 2020 regularly scheduled Borough Council Meeting.
PassedSet a public hearing for Tuesday, December 15, 2020 at 7:20 p.m., to consider Ordinance Number 1372, Fixing the Real Estate Tax for fiscal year 2021, at no tax increase.
PassedAuthorized a budget line item transfer #1-2020 in the amount of $10,000.00 from line item 08-429.450 to 08-429.220 to cover the cost of pump station pump repairs.
PassedAppointed Hanover Engineering to review the Land Development Plan for the Eagle Valley Pump Station.
PassedRequired a maintenance bond from the PennDOT contractor performing the work for the Route 80 Exit 308 project at a cost not to exceed $20,000.00.
PassedApproved the COVID-19 Symptom and Temperature Policy as presented, contingent upon solicitor and union approval.
PassedApproved Warrant List 201117, as presented.
Passed