Approved minutes of January 3, 2023 sewer committee meeting
PassedApproved generator service contract with Engines Inc.
PassedApproved failover estimate from ARGS Technology for $3,874.00
PassedConcerns about septic mounds in his neighborhood (Tara Drive) being in a state of failure or potential failure
The approved generator service contract and failover estimate are expected to improve the reliability of the township's sewer system.
A type of control equipment used at pump stations
A one-time installation cost for a backup internet system in each sewer pump station
This structured legislative summary was generated using AI analysis of the official municipal record. For verified legal documentation, please download and consult the original PDF.