Authorize an engineering change of scope for a structural analysis of the Middle Dam, based on coring results, to develop options for a fix at a cost not to exceed $50,000.00.
PassedApprove Payment Request No. 15 for Pioneer Construction Co. Inc. in the amount of $773,034.43.
PassedAuthorize RKR Hess to perform the 2023 annual dam inspection at a cost not to exceed $1,500.00.
PassedGarbage violations and can lid requirements
Single-stream recycling
Resale inspections
The approved engineering change for the Middle Dam will provide options for a fix, which may impact property values and safety. The payment requests for Pioneer Construction Co. Inc. and RKR Hess will fund ongoing infrastructure projects.
A Pennsylvania state law requiring municipalities to develop and implement stormwater management plans.
A National Pollutant Discharge Elimination System permit required for wastewater treatment plants.
This structured legislative summary was generated using AI analysis of the official municipal record. For verified legal documentation, please download and consult the original PDF.
Authorize RKR Hess to investigate grant funding sources to breach and remove the Lower Dam and sedimentation at a cost not to exceed $2,000.00.
PassedAuthorize advertising for a Borough Manager at a cost not to exceed $5,000.00.
Passed